BUILDING A SOLAR HOUSE IN FRANCE - week 16 - final windows and more interior »  Viewing imgp0268     [Image 14 of 16]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: The finished roof window . The solar panels for the domestic hot water will be just in front of them.
View towards the corner of the kitchen with larder door and stair hole and front door on the right. The doors are solid birch to be glazed. They were bought from the Leroy Merlin sale.

The corner with the door into the bedroom and bathroom lobby (lingerie)

Margaret by the contentious front door.  It was designed to hinge on the right to open against the stair landing down to the 'sous sol' to the right, with more space to step into the entrance lobby and take off coats etc.

Inside the front door with the stair to the 'sous sol'  on the left.  As the door is hung now you step towards  the landing at the top of the stair which is awkward and dangerous. In addition all the light switches will be behind the door. It will have to be rehung.

The main living and dining area windows and sliding door onto the terrace (yet to be backfilled to cover the rainwater cistern).

Next slide
 
imgp0268.jpg - Feb 15, 2008 - 04:26 PM
Mezzanine and dining area windows.

Elevation to the terrace.  At last the house is watertight and airtight (nearly) and relatively secure.  Now I can down tools and leave for lunch just locking the door behind me, instead of having to put everything back in the van or down in the cellar store every time I leave the site. We have only had one small thing stolen, but the local builders do not recommend leaving tools lying around. Now I can get all the insulation delivered and bring the things we have bought on the sales for the plumber and electrician Mr Desvergnes who is due to start next week.

Album last updated on Mar 30, 2008 - 05:02 PM
Powered by JAlbum 6.5 and BluPlusPlus skin