Building a solar House in France - plastering, stone wall, septic tank and sand filter »  Viewing imgp0650     [Image 33 of 36]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Next slide
 
Apr 22, 2008 - 09:10 AM
Comment: Laying the piping for the overflow and drain from the base of the retaining wall.
Album last updated on Apr 26, 2008 - 09:51 PM
Powered by JAlbum 6.5 and BluPlusPlus skin