BUILDING A SOLAR HOUSE IN FRANCE - WEEK 7 - finishing monomur walls ready for roof »  Viewing imgp9224     [Image 10 of 21]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: I had ordered limestone blocks to go round the small window in the stone wall on the North East. I went and fetched them from the quarry early enough to take advantage of the crane to swing them down.
After lunch Francis started the waterproof plaster on the retaining walls, using a compressed air thing that splatted the plaster on.

The chainage or horizontal reinforced concrete along the tops of the monomur walls was poured.  On the north east it is at the window lintel level, but here it drops to below where the trusses will rest on the walls.

Here Francis is smoothing off the waterproof plaster.

Thursday afternoon - 4 men on site in the morning to speed up the plastering.

The South corner where the external stairs come down - there will be stone retaining wall on the corner.

View from the West.

Finished off all lintels , waterproof plaster and chainage on Friday.  Mr Dubuisson the joiner making the windows came to measure the openings and discuss cill details.  Expected Francis to disappear for a few weeks now as the carpenter was not ready to start the roof trusses.

All scaffolding and left-over monomur briques removed and slab cleaned off.

Next slide
 
Jul 03, 2007 - 09:59 AM
Francis phoned on Monday morning to say that he was on site to finish everything necessary for the carpenter.  Mainly filling enough of the level on the terrace for Mr Mazieres' Manitou telescopic shovel/crane to get near.

But before he could back fill, he had to put the Delta MS waterproofing sheet against the wall and the drain in the cahnnel.

The 4000 litre rain water cistern was brought and lowered into place place by Faye's Manitou. and the rest of the waterproofing sheet fixed in place.

The Manitou shovel with telescopic bucket putting sand around the waterproofing and over the drains.

The second lorry load of stone to fill under the auvent (roofed area linking house and garage)

Francis' assistant (today the lorry driver) removing the shuttering by the hole for the staircase down to the sous sol.

View fom South as it was left on Tuesday evening.

It rained quite hard on Tuesday and I worked alongside Francis who came in the afternoon without anyone else, directing him where to place stone and sand, and sometimes having to manually move rocks.

Album last updated on Jul 29, 2007 - 04:28 PM